Barfoot Foods, Sefter Farm, Pagham

March 16, 2023

Our largest most involved project to date has been on-going since July 2018.  We have been an integral part of the team that has undertaken a large development of the distribution centre at Barfoot Foods. Key tasks that we have undertaken are:

  • large external concrete slabs (measuring over 50,000m2 to date)
  • Installation of rising main and deep drainage
  • Installation of new electrical services
  • Installation of large water storage tank

The installation of the 115,000 litre water storage tank was a complex operation. The large excavation area was de-watered using pumps in the surrounding Mabey form work and the tank was lifted in place with 100 tonne crane.